Construction layout and cut sheets
Stakeout points and a cut sheet the crew can work from.
3 min read
Stakeout lists
- Choose the points, alignment or surface to stake.
- Set the offsets and the interval where they apply.
- Generate the list: station, offset, design elevation, existing elevation, and the cut or fill between them.
The cut sheet
The list prints as a cut sheet with your branding on it, the document that actually goes in the truck. Every figure states what it came from, so a crew can question a number rather than guess at it.
Read next
- Alignments, profiles and cross sectionsCentrelines with stationing, existing ground and design profiles, and sections across them.
- Volumes: against a datum and between two surfacesExact prismatic volumes, with the method and the area stated so the number can be checked.
- Sheets: setting one up and plotting itA sheet at a real scale, with a title block, a legend and your logo: then a PDF you can prove.
Something here wrong or missing? Tell us and we will fix it.